Whangarei Safety Projects 

Various sites around Whangarei needed slipform kerbing installed alongside the new footpaths. This site was particulary challenging due to the tight timeframes and working within tight temporary traffic management closures.


Total linear meters of kerbing: 980m of kerb & Channel, V-Drain, Kerb & Nib, and Mountable kerb

A WMConstruction white truck is parked next to a freshly extruded Kerb on the side of a road.
A concrete walkway is being built on the side of a road